- Company
- Projects
- Investors
- News
- CONTACT
Gold discovery made by Transition Metals in 2010, <1km from a paved highway, in the heart of the historic Gowganda silver-cobalt camp (~125 km south of Timmins, Ontario)
Widespread gold mineralized system over a strike length of 1.25 km, with visible gold at surface with highlights including: 97 g/t gold over 40 cm (channel sample); 2.4 g/t over 7.1 m and 82.5 g/t over 0.4 m (drill program, within 35 m of surface).
Optioned to Battery Mineral Resources who must spend $3.4 million over 3 years to earn a 60% interest with an option to increase to 80% by completing a feasibility study on the project.